COMPLETION OF T-13; 40/53 MVA 138/13.8 KV SITE ASSEMBLY- TESTING

Image
COMPLETE ASSEMBLY OF 40/53 MVA 138/13.8 KV HYUNDAI STEP- UP TRANSFORMER 13.8 KV- LV CABINET INSTALLATION CORE- GROUND INSULATION RESISTANCE TEST DOBLE TESTING- WINDINGS, BUSHINGS  & SURGE ARRESTERS SFRA TEST- GRAPHS BCT'S TESTING TEMPERATURE MONITOR -FUNCTION  TEST

BC Hydro/John Hart - Transformer Assembly

Image
SUPERVISION ASSEMBLY  NOVEMBER 27 - DECEMBER 1, 2017 Below are the pictures of the project's initial state. FMI is the prime contractor. RMC was hired by Hyundai to oversee the site assembly, vacuum/oil filling and testing/commissioning. T13- STEP UP  40/53 MVA 138/13.8 KV POWER TRANSFORMER INSTALLATION OF CONSERVATOR TANK, RADIATORS AND BUSHINGS (OTHER PARTS). INTERNAL INSPECTION