BC Hydro/John Hart - Transformer Assembly
SUPERVISION ASSEMBLY NOVEMBER 27 - DECEMBER 1, 2017 Below are the pictures of the project's initial state. FMI is the prime contractor. RMC was hired by Hyundai to oversee the site assembly, vacuum/oil filling and testing/commissioning. T13- STEP UP 40/53 MVA 138/13.8 KV POWER TRANSFORMER INSTALLATION OF CONSERVATOR TANK, RADIATORS AND BUSHINGS (OTHER PARTS). INTERNAL INSPECTION